Wattly
Public EV charger

Orange County North Campus - Bonnie B. Davis Center

1020 US Highway 70

AvailableUp to 4 kW · SlowType 1

Charger types at Orange County North Campus - Bonnie B. Davis Center

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Questions about Orange County North Campus - Bonnie B. Davis Center

How fast is the EV charger at Orange County North Campus - Bonnie B. Davis Center?

Orange County North Campus - Bonnie B. Davis Center charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Orange County North Campus - Bonnie B. Davis Center have?

Orange County North Campus - Bonnie B. Davis Center has 2 connectors: 2 × Type 1 (4kW).

Can anyone use the charger at Orange County North Campus - Bonnie B. Davis Center?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Listed since
Mar 2023

Contact