Public EV chargerby Blink Charging
Plant Construction
300 Newhall Street
Charger types at Plant Construction
1 unitRun by Blink ChargingOperator website ↗
Questions about Plant Construction
How fast is the EV charger at Plant Construction?
Plant Construction charges at up to 4kW, which counts as slow charging in the UK.
What connectors does Plant Construction have?
Plant Construction has 7 connectors: 7 × Type 1 (4kW).
Who runs the charger at Plant Construction?
The charger at Plant Construction is run by Blink Charging. The operator's website has account and tariff details.
Can anyone use the charger at Plant Construction?
Open to the public, no membership required.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 7 in total
- Access
- Public
- Network
- Blink Charging
- Listed since
- Sept 2023
Contact
- Phone
- 888-998-2546
- Website
- www.blinkcharging.com
Within 2 miles