Wattly
Public EV chargerby Blink Charging

Plant Construction

300 Newhall Street

AvailableUp to 4 kW · SlowType 1

Charger types at Plant Construction

1 unit
Type 1J17724kWSlowStatus unknown7 connectors

Run by Blink ChargingOperator website ↗

Questions about Plant Construction

How fast is the EV charger at Plant Construction?

Plant Construction charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Plant Construction have?

Plant Construction has 7 connectors: 7 × Type 1 (4kW).

Who runs the charger at Plant Construction?

The charger at Plant Construction is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at Plant Construction?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
7 in total
Access
Public
Network
Blink Charging
Listed since
Sept 2023

Contact