Wattly
Public EV chargerby Power Dot

PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys

Route Nationale

AvailableUp to 100 kW · Ultra-rapidCCS, CHAdeMO, Type 20p

Charger types at PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys

3 units
CCSType 2100kWUltra-rapidAvailable1 connector
CHAdeMO50kWRapidAvailable1 connector
Type 2Socket Only22kWFastAvailable2 connectors

Run by Power Dot

About PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys

The PowerDot EV charger is located at the Parc d'Activités Saint-Martin in Aire-sur-la-Lys, France. This charging station is situated along the Route Nationale, making it easily accessible for EV drivers passing through the area. The charger is open to the public and offers multiple types of charging options.

Questions about PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys

How fast is the EV charger at PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys?

PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys charges at up to 100kW, which counts as ultra-rapid charging in the UK. Its connectors range from 22kW to 100kW.

What connectors does PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys have?

PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys has 4 connectors: 1 × CCS (100kW), 1 × CHAdeMO (50kW) and 2 × Type 2 (22kW).

How much does it cost to charge at PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys?

The listed price at PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys is 0p. Note: 605€/kWh. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys?

The charger at PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys is run by Power Dot.

Can anyone use the charger at PowerDot - Parc d'Activités Saint-Martin - Aire-sur-la-Lys?

Open to the public, no membership required.

Price and access

Price
0p
605€/kWh
Max power
100 kW
Ultra-rapid
Connectors
CCS, CHAdeMO, Type 2
4 in total
Access
Public
Network
Power Dot
Listed since
Sept 2022