Public EV chargerby MOL
Érd Ercsi MOL
Ercsi út
Charger types at Érd Ercsi MOL
3 unitsRun by MOLOperator website ↗
Questions about Érd Ercsi MOL
How fast is the EV charger at Érd Ercsi MOL?
Érd Ercsi MOL charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.
What connectors does Érd Ercsi MOL have?
Érd Ercsi MOL has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).
Who runs the charger at Érd Ercsi MOL?
The charger at Érd Ercsi MOL is run by MOL. The operator's website has account and tariff details.
Can anyone use the charger at Érd Ercsi MOL?
Open to the public, pay at the charger.
Price and access
- Max power
- 50 kW
- Rapid
- Connectors
- CCS, CHAdeMO
- 3 in total
- Access
- Pay at location
- Network
- MOL
- Listed since
- Jul 2020
Contact
- Website
- molplugee.hu/hu/toltoink
Within 2 miles