Public EV chargerby PLN (Indonesia)
Rest area KM 282B Tegal
Rest area KM 282B Tegal, , Tol Pejagan-Pemalang, Area Sawah/Kebun, Lebeteng, Tarub,
Charger types at Rest area KM 282B Tegal
3 unitsRun by PLN (Indonesia)
Questions about Rest area KM 282B Tegal
How fast is the EV charger at Rest area KM 282B Tegal?
Rest area KM 282B Tegal charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 22kW to 50kW.
What connectors does Rest area KM 282B Tegal have?
Rest area KM 282B Tegal has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (22kW).
How much does it cost to charge at Rest area KM 282B Tegal?
The listed price at Rest area KM 282B Tegal is £24.67 per kWh. Note: Rp. Tariffs can change, so check the charger or the operator's app before you plug in.
Who runs the charger at Rest area KM 282B Tegal?
The charger at Rest area KM 282B Tegal is run by PLN (Indonesia).
Can anyone use the charger at Rest area KM 282B Tegal?
Open to the public, no membership required.
Price and access
- Price
- £24.67/kWh
- Rp
- Max power
- 50 kW
- Rapid
- Connectors
- CCS, CHAdeMO
- 3 in total
- Access
- Public
- Network
- PLN (Indonesia)
- Listed since
- May 2024