Wattly
Public EV chargerby EDP

Rest. el Pindal 2

Pindal 2

AvailableUp to 50 kW · RapidCCS, CHAdeMO0p

Charger types at Rest. el Pindal 2

3 units
CCSType 250kWRapidAvailable1 connector
CHAdeMO50kWRapidAvailable1 connector
OtherType 2 (Tethered Connector)43kWRapidAvailable1 connector

Run by EDP

About Rest. el Pindal 2

Located at Rest. el Pindal 2 in Pindal 2, this EV charger is open to the public but membership is required to access the charging stations. The chargers available at this location include CCS (Type 2) with a power output of 50 kWh, CHAdeMO with a power output of 50 kWh, and Type 2 with a tethered connector and a power output of 43 kWh.

Questions about Rest. el Pindal 2

How fast is the EV charger at Rest. el Pindal 2?

Rest. el Pindal 2 charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.

What connectors does Rest. el Pindal 2 have?

Rest. el Pindal 2 has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).

How much does it cost to charge at Rest. el Pindal 2?

The listed price at Rest. el Pindal 2 is 0p. Note: 54€/kWh (0,10€/min parked without charging). Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Rest. el Pindal 2?

The charger at Rest. el Pindal 2 is run by EDP.

Can anyone use the charger at Rest. el Pindal 2?

Public, but a membership or subscription is required.

Price and access

Price
0p
54€/kWh (0,10€/min parked without charging)
Max power
50 kW
Rapid
Connectors
CCS, CHAdeMO
3 in total
Access
Members
Network
EDP
Listed since
Sept 2022