Wattly
Public EV chargerby TotalEnergies (ES)

Rest. La Morena

Autovía del Mediterráneo

AvailableUp to 100 kW · Ultra-rapidCCS, CHAdeMO, Type 250p/kWh

Charger types at Rest. La Morena

5 units
CCSType 2100kWUltra-rapidAvailable2 connectors
CCSType 250kWRapidAvailable1 connector
CHAdeMO50kWRapidAvailable2 connectors
OtherType 2 (Tethered Connector)43kWRapidAvailable1 connector
Type 2Socket Only22kWFastAvailable1 connector

Run by TotalEnergies (ES)

Questions about Rest. La Morena

How fast is the EV charger at Rest. La Morena?

Rest. La Morena charges at up to 100kW, which counts as ultra-rapid charging in the UK. Its connectors range from 22kW to 100kW.

What connectors does Rest. La Morena have?

Rest. La Morena has 7 connectors: 3 × CCS (up to 100kW), 2 × CHAdeMO (50kW), 1 × Type 2 (22kW) and 1 × Other (43kW).

How much does it cost to charge at Rest. La Morena?

The listed price at Rest. La Morena is 50p per kWh. Note: €/kWh >60kW - 0,39€/kWh DC - 0,32€/kWh AC. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Rest. La Morena?

The charger at Rest. La Morena is run by TotalEnergies (ES).

Can anyone use the charger at Rest. La Morena?

Public, but a membership or subscription is required.

Price and access

Price
50p/kWh
€/kWh >60kW - 0,39€/kWh DC - 0,32€/kWh AC
Max power
100 kW
Ultra-rapid
Connectors
CCS, CHAdeMO, Type 2
7 in total
Access
Members
Network
TotalEnergies (ES)
Listed since
Dec 2022