Public EV chargerby TotalEnergies (ES)
Rest. La Morena
Autovía del Mediterráneo
Charger types at Rest. La Morena
5 unitsRun by TotalEnergies (ES)
Questions about Rest. La Morena
How fast is the EV charger at Rest. La Morena?
Rest. La Morena charges at up to 100kW, which counts as ultra-rapid charging in the UK. Its connectors range from 22kW to 100kW.
What connectors does Rest. La Morena have?
Rest. La Morena has 7 connectors: 3 × CCS (up to 100kW), 2 × CHAdeMO (50kW), 1 × Type 2 (22kW) and 1 × Other (43kW).
How much does it cost to charge at Rest. La Morena?
The listed price at Rest. La Morena is 50p per kWh. Note: €/kWh >60kW - 0,39€/kWh DC - 0,32€/kWh AC. Tariffs can change, so check the charger or the operator's app before you plug in.
Who runs the charger at Rest. La Morena?
The charger at Rest. La Morena is run by TotalEnergies (ES).
Can anyone use the charger at Rest. La Morena?
Public, but a membership or subscription is required.
Price and access
- Price
- 50p/kWh
- €/kWh >60kW - 0,39€/kWh DC - 0,32€/kWh AC
- Max power
- 100 kW
- Ultra-rapid
- Connectors
- CCS, CHAdeMO, Type 2
- 7 in total
- Access
- Members
- Network
- TotalEnergies (ES)
- Listed since
- Dec 2022