Public EV chargerby TotalEnergies (ES)
Rest. Los Rodríguez
Calle Real
Charger types at Rest. Los Rodríguez
3 unitsRun by TotalEnergies (ES)
Questions about Rest. Los Rodríguez
How fast is the EV charger at Rest. Los Rodríguez?
Rest. Los Rodríguez charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.
What connectors does Rest. Los Rodríguez have?
Rest. Los Rodríguez has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).
How much does it cost to charge at Rest. Los Rodríguez?
The listed price at Rest. Los Rodríguez is 0p. Note: 50€/kWh >60kW - 0,39€/kWh 50kW - 0,32€/kWh AC. Tariffs can change, so check the charger or the operator's app before you plug in.
Who runs the charger at Rest. Los Rodríguez?
The charger at Rest. Los Rodríguez is run by TotalEnergies (ES).
Can anyone use the charger at Rest. Los Rodríguez?
Public, but a membership or subscription is required.
Price and access
- Price
- 0p
- 50€/kWh >60kW - 0,39€/kWh 50kW - 0,32€/kWh AC
- Max power
- 50 kW
- Rapid
- Connectors
- CCS, CHAdeMO
- 3 in total
- Access
- Members
- Network
- TotalEnergies (ES)
- Listed since
- Aug 2022
Within 2 miles