Wattly
Public EV charger

Saint Regis Mohawk Tribe Administration Building

29 Margaret Terrance Memorial Way

AvailableUp to 4 kW · SlowType 1

Charger types at Saint Regis Mohawk Tribe Administration Building

1 unit
Type 1J17724kWSlowStatus unknown1 connector

Questions about Saint Regis Mohawk Tribe Administration Building

How fast is the EV charger at Saint Regis Mohawk Tribe Administration Building?

Saint Regis Mohawk Tribe Administration Building charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Saint Regis Mohawk Tribe Administration Building have?

Saint Regis Mohawk Tribe Administration Building has 1 connector: 1 × Type 1 (4kW).

Can anyone use the charger at Saint Regis Mohawk Tribe Administration Building?

Open to the public, pay at the charger.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
1 in total
Access
Pay at location
Listed since
Feb 2023

Contact