Wattly
Public EV chargerby ChargePoint

SLCO FLEET GOVCNTR LVL1 #2

2001 State Street

AvailableUp to 4 kW · SlowType 1

Charger types at SLCO FLEET GOVCNTR LVL1 #2

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about SLCO FLEET GOVCNTR LVL1 #2

How fast is the EV charger at SLCO FLEET GOVCNTR LVL1 #2?

SLCO FLEET GOVCNTR LVL1 #2 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does SLCO FLEET GOVCNTR LVL1 #2 have?

SLCO FLEET GOVCNTR LVL1 #2 has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at SLCO FLEET GOVCNTR LVL1 #2?

The charger at SLCO FLEET GOVCNTR LVL1 #2 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at SLCO FLEET GOVCNTR LVL1 #2?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Feb 2023

Contact