Public EV chargerby ChargePoint
STADTWERKE BO / OEKOSTROM 2
Matthias-Claudius-Straße 25, Mitte
Charger types at STADTWERKE BO / OEKOSTROM 2
1 unitRun by ChargePoint
Questions about STADTWERKE BO / OEKOSTROM 2
How fast is the EV charger at STADTWERKE BO / OEKOSTROM 2?
STADTWERKE BO / OEKOSTROM 2 charges at up to 4kW, which counts as slow charging in the UK.
Who runs the charger at STADTWERKE BO / OEKOSTROM 2?
The charger at STADTWERKE BO / OEKOSTROM 2 is run by ChargePoint.
Can anyone use the charger at STADTWERKE BO / OEKOSTROM 2?
Open to the public, no membership required.
Price and access
- Max power
- 4 kW
- Slow
- Access
- Public
- Network
- ChargePoint
- Listed since
- Mar 2014
Within 2 miles