Starbucks A1 J34
Blyth Road
Charger types at Starbucks A1 J34
2 unitsRun by Fuuse
About Starbucks A1 J34
Starbucks A1 J34 Blyth Road is a public EV charger location where users can pay at the location for charging services. The chargers available at this location include CCS (Type 2) with a power output of 52 kWh and CHAdeMO with a power output of 52 kWh. This makes it convenient for electric vehicle owners to charge their vehicles while enjoying a cup of coffee at Starbucks.
Located at A1 J34 Blyth Road, this EV charger location provides a convenient stop for electric vehicle owners traveling in the area. The availability of both CCS and CHAdeMO chargers ensures compatibility with a wide range of electric vehicles, making it a versatile charging option for drivers. With the option to pay at the location, users can easily access charging services without the need for a subscription or membership.
The Starbucks A1 J34 Blyth Road EV charger location offers a practical solution for electric vehicle owners in need of a quick charge. The 52 kWh power output of both the CCS and CHAdeMO chargers ensures efficient charging for electric vehicles, allowing drivers to quickly top up their battery levels. With its convenient location and easy payment options, this EV charger location is a valuable resource for electric vehicle owners on the go.
Questions about Starbucks A1 J34
How fast is the EV charger at Starbucks A1 J34?
Starbucks A1 J34 charges at up to 52kW, which counts as rapid charging in the UK.
What connectors does Starbucks A1 J34 have?
Starbucks A1 J34 has 2 connectors: 1 × CCS (52kW) and 1 × CHAdeMO (52kW).
How much does it cost to charge at Starbucks A1 J34?
The listed price at Starbucks A1 J34 is 65p per kWh. Tariffs can change, so check the charger or the operator's app before you plug in.
Who runs the charger at Starbucks A1 J34?
The charger at Starbucks A1 J34 is run by Fuuse.
Can anyone use the charger at Starbucks A1 J34?
Open to the public, pay at the charger.
Price and access
- Price
- 65p/kWh
- Max power
- 52 kW
- Rapid
- Connectors
- CCS, CHAdeMO
- 2 in total
- Access
- Pay at location
- Network
- Fuuse
- Listed since
- Mar 2024
Within 2 miles