Public EV chargerby Flash Charging
Steel Lot
621 Riverside Dr.
Charger types at Steel Lot
1 unitRun by Flash ChargingOperator website ↗
Questions about Steel Lot
How fast is the EV charger at Steel Lot?
Steel Lot charges at up to 4kW, which counts as slow charging in the UK.
What connectors does Steel Lot have?
Steel Lot has 2 connectors: 2 × Type 1 (4kW).
Who runs the charger at Steel Lot?
The charger at Steel Lot is run by Flash Charging. The operator's website has account and tariff details.
Can anyone use the charger at Steel Lot?
Open to the public, no membership required.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 2 in total
- Access
- Public
- Network
- Flash Charging
- Listed since
- Jul 2023
Contact
- Phone
- 855-223-5351
Within 2 miles