Public EV chargerby EnBW (D)
Sudermannstr. 2
Sudermannstr. 2
Charger types at Sudermannstr. 2
3 unitsRun by EnBW (D)
Questions about Sudermannstr. 2
How fast is the EV charger at Sudermannstr. 2?
Sudermannstr. 2 charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.
What connectors does Sudermannstr. 2 have?
Sudermannstr. 2 has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).
Who runs the charger at Sudermannstr. 2?
The charger at Sudermannstr. 2 is run by EnBW (D).
Price and access
- Max power
- 50 kW
- Rapid
- Connectors
- CCS, CHAdeMO
- 3 in total
- Network
- EnBW (D)
- Listed since
- Jul 2021