Wattly
Public EV chargerby EnBW (D)

Sudermannstr. 2

Sudermannstr. 2

AvailableUp to 50 kW · RapidCCS, CHAdeMO

Charger types at Sudermannstr. 2

3 units
OtherType 2 (Tethered Connector)43kWRapidAvailable1 connector
CCSType 250kWRapidAvailable1 connector
CHAdeMO50kWRapidAvailable1 connector

Run by EnBW (D)

Questions about Sudermannstr. 2

How fast is the EV charger at Sudermannstr. 2?

Sudermannstr. 2 charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.

What connectors does Sudermannstr. 2 have?

Sudermannstr. 2 has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).

Who runs the charger at Sudermannstr. 2?

The charger at Sudermannstr. 2 is run by EnBW (D).

Price and access

Max power
50 kW
Rapid
Connectors
CCS, CHAdeMO
3 in total
Network
EnBW (D)
Listed since
Jul 2021