Wattly
Public EV chargerby Blink Charging

Suffolk Construction Company

65 Allerton Street

AvailableUp to 4 kW · SlowType 1

Charger types at Suffolk Construction Company

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by Blink ChargingOperator website ↗

Questions about Suffolk Construction Company

How fast is the EV charger at Suffolk Construction Company?

Suffolk Construction Company charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Suffolk Construction Company have?

Suffolk Construction Company has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at Suffolk Construction Company?

The charger at Suffolk Construction Company is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at Suffolk Construction Company?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
Blink Charging
Listed since
Mar 2023

Contact