Wattly
Public EV chargerby Stadtwerke Düsseldorf AG

SWD Belsenstraße

Belsenstraße, Oberkassel

AvailableUp to 22 kW · FastType 2

Charger types at SWD Belsenstraße

1 unit
Type 2Socket Only22kWFastAvailable2 connectors

Run by Stadtwerke Düsseldorf AG

About SWD Belsenstraße

The EV charger location at SWD Belsenstraße Belsenstraße is a public charging station that requires membership for use. The chargers available at this location are Type 2 (Socket Only) with a charging capacity of 22 kWh. This makes it a convenient option for electric vehicle owners looking to charge their vehicles while out and about.

Questions about SWD Belsenstraße

How fast is the EV charger at SWD Belsenstraße?

SWD Belsenstraße charges at up to 22kW, which counts as fast charging in the UK.

What connectors does SWD Belsenstraße have?

SWD Belsenstraße has 2 connectors: 2 × Type 2 (22kW).

Who runs the charger at SWD Belsenstraße?

The charger at SWD Belsenstraße is run by Stadtwerke Düsseldorf AG.

Can anyone use the charger at SWD Belsenstraße?

Public, but a membership or subscription is required.

Price and access

Max power
22 kW
Fast
Connectors
Type 2
2 in total
Access
Members
Network
Stadtwerke Düsseldorf AG
Listed since
May 2023