Wattly
Public EV chargerby Stadtwerke Düsseldorf AG

SWD Factory Campus E-Bike-Ladestation

Erkrather Straße 401

AvailableUp to 4 kW · SlowFree

Charger types at SWD Factory Campus E-Bike-Ladestation

1 unit
OtherCEE 7/4 - Schuko - Type F4kWSlowAvailable4 connectors

Run by Stadtwerke Düsseldorf AGOperator website ↗

About SWD Factory Campus E-Bike-Ladestation

The SWD Factory Campus E-Bike-Ladestation is located at Erkrather Straße 401. This public charging station is equipped with CEE 7/4, Schuko, and Type F outlets, providing a maximum power output of 4 kWh. It is conveniently located for e-bike users who need to recharge their batteries during their commute or while visiting the SWD Factory Campus.

Questions about SWD Factory Campus E-Bike-Ladestation

How fast is the EV charger at SWD Factory Campus E-Bike-Ladestation?

SWD Factory Campus E-Bike-Ladestation charges at up to 4kW, which counts as slow charging in the UK.

How much does it cost to charge at SWD Factory Campus E-Bike-Ladestation?

Charging at SWD Factory Campus E-Bike-Ladestation is listed as free. Check on site, as tariffs and parking charges can change.

Who runs the charger at SWD Factory Campus E-Bike-Ladestation?

The charger at SWD Factory Campus E-Bike-Ladestation is run by Stadtwerke Düsseldorf AG. The operator's website has account and tariff details.

Can anyone use the charger at SWD Factory Campus E-Bike-Ladestation?

Open to the public, no membership required.

Price and access

Price
Free
Max power
4 kW
Slow
Access
Public
Network
Stadtwerke Düsseldorf AG
Listed since
Feb 2017

Contact