SWD Industrie- und Handelskammer
Ernst-Schneider-Platz 1
Charger types at SWD Industrie- und Handelskammer
2 unitsRun by Stadtwerke Düsseldorf AGOperator website ↗
About SWD Industrie- und Handelskammer
The SWD Industrie- und Handelskammer Ernst-Schneider-Platz 1 is a public location that offers EV charging services. It is located in the city center and is easily accessible for EV owners. This location has a variety of chargers available, including Type 2 (Socket Only) 22 kWh, CEE 7/4, Schuko, and Type F 4 kWh chargers.
EV owners can pay for their charging session directly at this location. The chargers are equipped with Type 2 sockets, which are commonly used for EV charging. The CEE 7/4, Schuko, and Type F chargers are also available for use, providing a range of options for different types of EVs. With a maximum output of 22 kWh and 4 kWh, these chargers can quickly and efficiently charge your EV while you are out and about.
Located at the SWD Industrie- und Handelskammer Ernst-Schneider-Platz 1, this EV charging location is a convenient and reliable option for EV owners. With a variety of chargers available and the option to pay on-site, it offers a hassle-free charging experience. Whether you are in need of a quick charge or a longer one, this location has you covered with its Type 2, CEE 7/4, Schuko, and Type F chargers, making it a great choice for all types of EVs.
Questions about SWD Industrie- und Handelskammer
How fast is the EV charger at SWD Industrie- und Handelskammer?
SWD Industrie- und Handelskammer charges at up to 22kW, which counts as fast charging in the UK. Its connectors range from 4kW to 22kW.
What connectors does SWD Industrie- und Handelskammer have?
SWD Industrie- und Handelskammer has 4 connectors: 2 × Type 2 (22kW) and 2 × Other (4kW).
Who runs the charger at SWD Industrie- und Handelskammer?
The charger at SWD Industrie- und Handelskammer is run by Stadtwerke Düsseldorf AG. The operator's website has account and tariff details.
Can anyone use the charger at SWD Industrie- und Handelskammer?
Open to the public, pay at the charger.
Price and access
- Max power
- 22 kW
- Fast
- Connectors
- Type 2
- 4 in total
- Access
- Pay at location
- Network
- Stadtwerke Düsseldorf AG
- Listed since
- Jan 2018
Contact
- Website
- www.stadtwerke-erkrath.de
Within 2 miles