Wattly
Public EV chargerby Stadtwerke Düsseldorf AG

SWD Ministerium für Wirtschaft

Neusser Straße 25, Unterbilk

AvailableUp to 22 kW · FastType 2Free

Charger types at SWD Ministerium für Wirtschaft

3 units
Type 2Socket Only22kWFastAvailable2 connectors
OtherCEE 7/4 - Schuko - Type F4kWSlowAvailable4 connectors
Type 2Socket Only11kWFastAvailable2 connectors

Run by Stadtwerke Düsseldorf AGOperator website ↗

About SWD Ministerium für Wirtschaft

The SWD Ministerium für Wirtschaft Neusser Straße 25 is a public location that offers EV charging services. Located at Neusser Straße 25, this facility requires a membership for access. The chargers available at this location include a Type 2 (Socket Only) 22 kWh charger, a CEE 7/4 - Schuko - Type F 4 kWh charger, and a Type 2 (Socket Only) 11 kWh charger.

Questions about SWD Ministerium für Wirtschaft

How fast is the EV charger at SWD Ministerium für Wirtschaft?

SWD Ministerium für Wirtschaft charges at up to 22kW, which counts as fast charging in the UK. Its connectors range from 4kW to 22kW.

What connectors does SWD Ministerium für Wirtschaft have?

SWD Ministerium für Wirtschaft has 8 connectors: 4 × Type 2 (up to 22kW) and 4 × Other (4kW).

How much does it cost to charge at SWD Ministerium für Wirtschaft?

Charging at SWD Ministerium für Wirtschaft is listed as free. Check on site, as tariffs and parking charges can change.

Who runs the charger at SWD Ministerium für Wirtschaft?

The charger at SWD Ministerium für Wirtschaft is run by Stadtwerke Düsseldorf AG. The operator's website has account and tariff details.

Can anyone use the charger at SWD Ministerium für Wirtschaft?

Public, but a membership or subscription is required.

Price and access

Price
Free
Max power
22 kW
Fast
Connectors
Type 2
8 in total
Access
Members
Network
Stadtwerke Düsseldorf AG
Listed since
Jan 2016

Contact