Wattly
Public EV chargerby Blink Charging

The Offices at Park Ten Phase I

16285 Park Ten Place

AvailableUp to 4 kW · SlowType 1

Charger types at The Offices at Park Ten Phase I

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by Blink ChargingOperator website ↗

Questions about The Offices at Park Ten Phase I

How fast is the EV charger at The Offices at Park Ten Phase I?

The Offices at Park Ten Phase I charges at up to 4kW, which counts as slow charging in the UK.

What connectors does The Offices at Park Ten Phase I have?

The Offices at Park Ten Phase I has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at The Offices at Park Ten Phase I?

The charger at The Offices at Park Ten Phase I is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at The Offices at Park Ten Phase I?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
Blink Charging
Listed since
Sept 2023

Contact