Wattly
Public EV chargerby Zunder

Torrent 2 - Dir. Castellón (Zunder)

GALP

AvailableUp to 90 kW · RapidCCS, CHAdeMO, Type 20p

Charger types at Torrent 2 - Dir. Castellón (Zunder)

3 units
CCSType 290kWRapidAvailable2 connectors
CHAdeMO90kWRapidAvailable2 connectors
Type 2Socket Only22kWFastAvailable2 connectors

Run by Zunder

About Torrent 2 - Dir. Castellón (Zunder)

Located in Torrent 2, Dir. Castellón, this EV charger station is operated by GALP and requires a membership for access. The station offers three types of chargers for electric vehicles: CCS (Type 2) with a power output of 90 kWh, CHAdeMO also with a power output of 90 kWh, and Type 2 (Socket Only) with a power output of 22 kWh.

Questions about Torrent 2 - Dir. Castellón (Zunder)

How fast is the EV charger at Torrent 2 - Dir. Castellón (Zunder)?

Torrent 2 - Dir. Castellón (Zunder) charges at up to 90kW, which counts as rapid charging in the UK. Its connectors range from 22kW to 90kW.

What connectors does Torrent 2 - Dir. Castellón (Zunder) have?

Torrent 2 - Dir. Castellón (Zunder) has 6 connectors: 2 × CCS (90kW), 2 × CHAdeMO (90kW) and 2 × Type 2 (22kW).

How much does it cost to charge at Torrent 2 - Dir. Castellón (Zunder)?

The listed price at Torrent 2 - Dir. Castellón (Zunder) is 0p. Note: 55€/kWh DC - 0,39€/kWh AC. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Torrent 2 - Dir. Castellón (Zunder)?

The charger at Torrent 2 - Dir. Castellón (Zunder) is run by Zunder.

Can anyone use the charger at Torrent 2 - Dir. Castellón (Zunder)?

Public, but a membership or subscription is required.

Price and access

Price
0p
55€/kWh DC - 0,39€/kWh AC
Max power
90 kW
Rapid
Connectors
CCS, CHAdeMO, Type 2
6 in total
Access
Members
Network
Zunder
Listed since
Mar 2021