Wattly
Public EV chargerby Blink Charging

Town of Orono, Town Office

59 Main Street

AvailableUp to 4 kW · SlowType 1

Charger types at Town of Orono, Town Office

1 unit
Type 1J17724kWSlowStatus unknown1 connector

Run by Blink ChargingOperator website ↗

Questions about Town of Orono, Town Office

How fast is the EV charger at Town of Orono, Town Office?

Town of Orono, Town Office charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Town of Orono, Town Office have?

Town of Orono, Town Office has 1 connector: 1 × Type 1 (4kW).

Who runs the charger at Town of Orono, Town Office?

The charger at Town of Orono, Town Office is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at Town of Orono, Town Office?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
1 in total
Access
Public
Network
Blink Charging
Listed since
Sept 2023

Contact