Wattly
Public EV chargerby Blink Charging

Tri County Transit

110 Industrial Parkway

AvailableUp to 4 kW · SlowType 1

Charger types at Tri County Transit

1 unit
Type 1J17724kWSlowStatus unknown1 connector

Run by Blink ChargingOperator website ↗

Questions about Tri County Transit

How fast is the EV charger at Tri County Transit?

Tri County Transit charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Tri County Transit have?

Tri County Transit has 1 connector: 1 × Type 1 (4kW).

Who runs the charger at Tri County Transit?

The charger at Tri County Transit is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at Tri County Transit?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
1 in total
Access
Public
Network
Blink Charging
Listed since
Sept 2023

Contact