Wattly
Public EV chargerby Stromnetz Hamburg

Wagnerstraße

Wagnerstraße 2

AvailableUp to 50 kW · RapidCHAdeMO, CCS, Type 2£1.73

Charger types at Wagnerstraße

3 units
CHAdeMO50kWRapidAvailable1 connector
CCSType 250kWRapidAvailable1 connector
Type 2Socket Only11kWFastAvailable1 connector

Run by Stromnetz Hamburg

About Wagnerstraße

Located on Wagnerstraße 2, this EV charger location offers convenient access to three different types of public chargers. The first is a CHAdeMO 50 kWh charger, followed by a CCS (Type 2) 50 kWh charger. Lastly, there is a Type 2 (Socket Only) 11 kWh charger available for use. These chargers are easily accessible and can accommodate a variety of electric vehicles.

Questions about Wagnerstraße

How fast is the EV charger at Wagnerstraße?

Wagnerstraße charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 11kW to 50kW.

What connectors does Wagnerstraße have?

Wagnerstraße has 3 connectors: 1 × CHAdeMO (50kW), 1 × CCS (50kW) and 1 × Type 2 (11kW).

How much does it cost to charge at Wagnerstraße?

The listed price at Wagnerstraße is £1.73. Note: € · €0.3213/kWh; Andere Tarife möglich. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Wagnerstraße?

The charger at Wagnerstraße is run by Stromnetz Hamburg.

Can anyone use the charger at Wagnerstraße?

Open to the public, no membership required.

Price and access

Price
£1.73
€ · €0.3213/kWh; Andere Tarife möglich
Max power
50 kW
Rapid
Connectors
CHAdeMO, CCS, Type 2
3 in total
Access
Public
Network
Stromnetz Hamburg
Listed since
Feb 2017