Public EV chargerby ZEF Energy
Wazee Lake County Park
N6302 N Brockway Rd
Charger types at Wazee Lake County Park
1 unitRun by ZEF EnergyOperator website ↗
Questions about Wazee Lake County Park
How fast is the EV charger at Wazee Lake County Park?
Wazee Lake County Park charges at up to 4kW, which counts as slow charging in the UK.
What connectors does Wazee Lake County Park have?
Wazee Lake County Park has 2 connectors: 2 × Type 1 (4kW).
Who runs the charger at Wazee Lake County Park?
The charger at Wazee Lake County Park is run by ZEF Energy. The operator's website has account and tariff details.
Can anyone use the charger at Wazee Lake County Park?
Open to the public, pay at the charger.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 2 in total
- Access
- Pay at location
- Network
- ZEF Energy
- Listed since
- Feb 2024
Contact
- Phone
- 888-493-3638
- Website
- www.zefenergy.com