Wattly
Public EV chargerby EnBW (D)

Westerwaldstrasse 12-14

Westerwaldstrasse 12-14

AvailableUp to 300 kW · Ultra-rapidCCS, CHAdeMO

Charger types at Westerwaldstrasse 12-14

3 units
CCSType 2300kWUltra-rapidAvailable1 connector
CCSType 2300kWUltra-rapidAvailable1 connector
CHAdeMO300kWUltra-rapidAvailable1 connector

Run by EnBW (D)

Questions about Westerwaldstrasse 12-14

How fast is the EV charger at Westerwaldstrasse 12-14?

Westerwaldstrasse 12-14 charges at up to 300kW, which counts as ultra-rapid charging in the UK.

What connectors does Westerwaldstrasse 12-14 have?

Westerwaldstrasse 12-14 has 3 connectors: 2 × CCS (300kW) and 1 × CHAdeMO (300kW).

Who runs the charger at Westerwaldstrasse 12-14?

The charger at Westerwaldstrasse 12-14 is run by EnBW (D).

Price and access

Max power
300 kW
Ultra-rapid
Connectors
CCS, CHAdeMO
3 in total
Network
EnBW (D)
Listed since
Jul 2021