Wattly
Public EV charger

A7 Dorno Est

A7 Autostrada dei Giovi / Serravalle

AvailableUp to 43 kW · RapidCHAdeMO, CCS, Type 2

Charger types at A7 Dorno Est

5 units
Type 2Socket Only22kWFastAvailable1 connector
CHAdeMO43kWRapidAvailable1 connector
CCSType 242kWRapidAvailable1 connector
Type 2Socket Only7kWFastAvailable1 connector
Type 2Socket Only22kWFastAvailable2 connectors

Questions about A7 Dorno Est

How fast is the EV charger at A7 Dorno Est?

A7 Dorno Est charges at up to 43kW, which counts as rapid charging in the UK. Its connectors range from 7kW to 43kW.

What connectors does A7 Dorno Est have?

A7 Dorno Est has 6 connectors: 1 × CHAdeMO (43kW), 1 × CCS (42kW) and 4 × Type 2 (up to 22kW).

Can anyone use the charger at A7 Dorno Est?

Open to the public, no membership required.

Price and access

Max power
43 kW
Rapid
Connectors
CHAdeMO, CCS, Type 2
6 in total
Access
Public
Listed since
Apr 2014