Wattly
Public EV charger

A7 Dorno Ovest

Autostrada dei Giovi / Serravalle

AvailableUp to 43 kW · RapidCHAdeMO, CCS, Type 2

Charger types at A7 Dorno Ovest

6 units
Type 2Socket Only22kWFastAvailable1 connector
CHAdeMO43kWRapidAvailable1 connector
CCSType 242kWRapidAvailable1 connector
CCSType 222kWFastAvailable1 connector
Type 2Socket OnlyPower n/aAvailable1 connector
Type 2Socket OnlyPower n/aAvailable1 connector

Questions about A7 Dorno Ovest

How fast is the EV charger at A7 Dorno Ovest?

A7 Dorno Ovest charges at up to 43kW, which counts as rapid charging in the UK. Its connectors range from 22kW to 43kW.

What connectors does A7 Dorno Ovest have?

A7 Dorno Ovest has 6 connectors: 1 × CHAdeMO (43kW), 2 × CCS (up to 42kW) and 3 × Type 2 (22kW).

Can anyone use the charger at A7 Dorno Ovest?

Open to the public, no membership required.

Price and access

Max power
43 kW
Rapid
Connectors
CHAdeMO, CCS, Type 2
6 in total
Access
Public
Listed since
Apr 2014