Wattly
Public EV chargerby Innogy SE (RWE eMobility)

An der Koppelschleuse 19

An der Koppelschleuse 19

AvailableUp to 22 kW · FastType 2

Charger types at An der Koppelschleuse 19

2 units
Type 2Socket Only22kWFastAvailable1 connector
Type 2Socket Only22kWFastAvailable1 connector

Run by Innogy SE (RWE eMobility)

About An der Koppelschleuse 19

An der Koppelschleuse 19 is a convenient location for electric vehicle owners to stop and recharge their vehicles. This charging station is located at An der Koppelschleuse 19 and offers two Type 2 (Socket Only) 22 kWh chargers. These chargers are perfect for those with Type 2 compatible vehicles, providing a fast and reliable source of power for their cars.

Questions about An der Koppelschleuse 19

How fast is the EV charger at An der Koppelschleuse 19?

An der Koppelschleuse 19 charges at up to 22kW, which counts as fast charging in the UK.

What connectors does An der Koppelschleuse 19 have?

An der Koppelschleuse 19 has 2 connectors: 2 × Type 2 (22kW).

Who runs the charger at An der Koppelschleuse 19?

The charger at An der Koppelschleuse 19 is run by Innogy SE (RWE eMobility).

Price and access

Max power
22 kW
Fast
Connectors
Type 2
2 in total
Network
Innogy SE (RWE eMobility)
Listed since
Jul 2021