Wattly
Public EV chargerby EnBW (D)

Auf der Herrschwiese 5-9

Auf der Herrschwiese 5-9

AvailableUp to 50 kW · RapidCCS, CHAdeMO

Charger types at Auf der Herrschwiese 5-9

3 units
OtherType 2 (Tethered Connector)43kWRapidAvailable1 connector
CCSType 250kWRapidAvailable1 connector
CHAdeMO50kWRapidAvailable1 connector

Run by EnBW (D)

About Auf der Herrschwiese 5-9

The EV charger location at Auf der Herrschwiese 5-9 offers convenient and efficient charging options for electric vehicles. The site features Type 2 (Tethered Connector) chargers with a power output of 43 kWh, as well as CCS (Type 2) and CHAdeMO chargers with a power output of 50 kWh.

Questions about Auf der Herrschwiese 5-9

How fast is the EV charger at Auf der Herrschwiese 5-9?

Auf der Herrschwiese 5-9 charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.

What connectors does Auf der Herrschwiese 5-9 have?

Auf der Herrschwiese 5-9 has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).

Who runs the charger at Auf der Herrschwiese 5-9?

The charger at Auf der Herrschwiese 5-9 is run by EnBW (D).

Price and access

Max power
50 kW
Rapid
Connectors
CCS, CHAdeMO
3 in total
Network
EnBW (D)
Listed since
Jul 2021