Wattly
Public EV chargerby ZapGrid

Comune Bordolano 2

Via dal Ponte

AvailableUp to 22 kW · FastType 250p/kWh

Charger types at Comune Bordolano 2

1 unit
Type 2Socket Only22kWFastAvailable2 connectors

Run by ZapGrid

Questions about Comune Bordolano 2

How fast is the EV charger at Comune Bordolano 2?

Comune Bordolano 2 charges at up to 22kW, which counts as fast charging in the UK.

What connectors does Comune Bordolano 2 have?

Comune Bordolano 2 has 2 connectors: 2 × Type 2 (22kW).

How much does it cost to charge at Comune Bordolano 2?

The listed price at Comune Bordolano 2 is 50p per kWh. Note: €. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Comune Bordolano 2?

The charger at Comune Bordolano 2 is run by ZapGrid.

Can anyone use the charger at Comune Bordolano 2?

Public, but a membership or subscription is required.

Price and access

Price
50p/kWh
€
Max power
22 kW
Fast
Connectors
Type 2
2 in total
Access
Members
Network
ZapGrid
Listed since
Nov 2023