Public EV chargerby ZapGrid
Comune Bordolano 3
Via al Ponte
Charger types at Comune Bordolano 3
1 unitRun by ZapGrid
Questions about Comune Bordolano 3
How fast is the EV charger at Comune Bordolano 3?
Comune Bordolano 3 charges at up to 22kW, which counts as fast charging in the UK.
What connectors does Comune Bordolano 3 have?
Comune Bordolano 3 has 2 connectors: 2 × Type 2 (22kW).
How much does it cost to charge at Comune Bordolano 3?
The listed price at Comune Bordolano 3 is 50p per kWh. Note: € /kWh. Tariffs can change, so check the charger or the operator's app before you plug in.
Who runs the charger at Comune Bordolano 3?
The charger at Comune Bordolano 3 is run by ZapGrid.
Can anyone use the charger at Comune Bordolano 3?
Public, but a membership or subscription is required.
Price and access
- Price
- 50p/kWh
- € /kWh
- Max power
- 22 kW
- Fast
- Connectors
- Type 2
- 2 in total
- Access
- Members
- Network
- ZapGrid
- Listed since
- Nov 2023
Within 2 miles