Wattly
Public EV chargerby AmpUp

Montclair Township Parking Utility Fullerton Lot

10 N Fullerton Ave

AvailableUp to 4 kW · SlowType 1

Charger types at Montclair Township Parking Utility Fullerton Lot

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by AmpUpOperator website ↗

Questions about Montclair Township Parking Utility Fullerton Lot

How fast is the EV charger at Montclair Township Parking Utility Fullerton Lot?

Montclair Township Parking Utility Fullerton Lot charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Montclair Township Parking Utility Fullerton Lot have?

Montclair Township Parking Utility Fullerton Lot has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at Montclair Township Parking Utility Fullerton Lot?

The charger at Montclair Township Parking Utility Fullerton Lot is run by AmpUp. The operator's website has account and tariff details.

Can anyone use the charger at Montclair Township Parking Utility Fullerton Lot?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
AmpUp
Listed since
Dec 2023

Contact

Website
ampup.io