Wattly
Public EV chargerby ChargePoint

OBUR STATION 2

32 Walnut Crescent

AvailableUp to 4 kW · SlowType 1

Charger types at OBUR STATION 2

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about OBUR STATION 2

How fast is the EV charger at OBUR STATION 2?

OBUR STATION 2 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does OBUR STATION 2 have?

OBUR STATION 2 has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at OBUR STATION 2?

The charger at OBUR STATION 2 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at OBUR STATION 2?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Feb 2023

Contact